Displaying Diary Entries for Unit: 31143 |
Page 1 of 1 (Total Records: 7)
|
Name: | JMR |
Team: | |
Date: | 8/11/2013 |
Entry: | Finally excavating again. All that sitting in the office is too much.
In B.107, we continued what we started. CMP drew the wall succession F.3373-3304-2426, with the fill between F.3373 and F.3304 being really clear, but F.3373 itself rather fuzzy towa... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/12/2013 |
Entry: | Today, TET, DSE and PAB worked together at removing sandbags out of Space 448 and finished towards the end of the day. The space looks quite good; we have not seen it since the end of the 2010 season. After a bit of cleaning, it will be as good as new.
... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/13/2013 |
Entry: | JHB and JMK removed the bins, which are now called F.3377, nicely sampling all the removed construction and fill. We had a discussion about whether or not this actually is a construction feature, or some unfortunate erosion/rubbish – I so far believe the ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/14/2013 |
Entry: | NMR is continuing to do a fabulous job with the plaster layers in Sp.454. She finished the part where the layer run up to the wall. I really want to hit this thing underneath to find out whether it is fill or brick material, but we will have to be patient... click here for more... |
|
Name: | CLC |
Team: | |
Date: | 8/26/2013 |
Entry: | 12-08-2013
In contrast to yesterday’s exploration and discovery of a new third floor, and subsequent collection of this floor, the fill, and floor below together (18376, 31144, 31143), I today began collecting each layer separately in 31136. For the ma... click here for more... |
|
Name: | CLC |
Team: | |
Date: | 8/26/2013 |
Entry: | 13-08-2013
Today I began excavating in 31135, again taking the upper floor (18736) separately and as a separate sample. Soon after starting, a small patch of the characteristic 1-2cm thick yellow white floor 31143 was observed at the base of 18376. It ... click here for more... |
|
Name: | CLC |
Team: | |
Date: | 8/26/2013 |
Entry: | 14-08-2013
Today I finished removing floor 31143, which is the last floor before the gray fill below. It was very satisfying to finally complete what I initially thought would a very difficult task, and indeed did prove to be a complicated procedure. T... click here for more... |
|
|