The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 31197

Page 1 of 1 (Total Records: 2)
Name: JMR 
Team:  
Date: 8/17/2013 
Entry: CMP worked further on clarifying walls in B.107 – SW corner by removing fill 31168. It is now clear that the wall under F.2426 in this corner has a slightly different outline/size and reaches further into the room than F.2426 (ca. 15cm). It has a very irr... click here for more... 
 
Name: JMR 
Team:  
Date: 8/19/2013 
Entry: CMP is working further on construction features in B.107. She cut the potential posthole 31197 and at the same time what seems to have been a protruding older wall under F.2426 and after a bit of excavation turns out to have been fill (with not many inclu... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell