When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 10061 | Page 1 of 2 (Total Records: 12)
| Sample No. | Type | Amount | Comment | Unit: 10061 | 1 | Flotation-routine | 37 | Evidence of buring process. Original entry of 30li replaced by volume for sample from Flot Log 19/08 | 2 | Archive | 0.5 | Standard | 3 | Column Sample-micromorphological | | Evidence for buring process. SAJ - unable to translate sample amount into numeric figure (litres), n | 4 | Column Sample-micromorphological | | Same. SAJ - unable to translate sample amount into numeric figure (litres), not enough information, | 5 | Column Sample-micromorphological | | Same. SAJ - unable to translate sample amount into numeric figure (litres), not enough information, | 6 | Column Sample-micromorphological | | Same. SAJ - unable to translate sample amount into numeric figure (litres), not enough information, | 7 | Bulk | 1 | Taken for burcu | 8 | Organic-subsample | | OPD-m2. Revershed 2009. Amount of 1 removed from amount field as its a subsample 7July10 | 9 | Organic-subsample | | DMS-f1. Revershed 2009. Amount of 1 removed from amount field as its a subsample 7July10 | 10 | Microscope Sample IST | 2 | OPB-c2 |
|
|
<< Back | Download these Samples |