Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 10612

Page 1 of 1 (Total Records: 4)
Sample No.TypeAmountComment
Unit: 10612 
Archive  sample was blank filled in to assign number to subsample 
Flotation-routine  sample was blank filled in to assign number to subsample 
Organic Residue-subsample  from archive s 1 for organic residue analysis of Fis; 15.4g; 1/8/2010 SK 
Botanics-phytoliths 0.02 subsample of s1 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell