Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 11950

Page 1 of 1 (Total Records: 4)
Sample No.TypeAmountComment
Unit: 11950 
Archive 0.5 standard Sample Amount was 0.5 lt. thought to represent 1/2 envelope, updated to 0.5 28th July 2009 
Architecture 0.2 architectural sample. Sample amount originally entered as 200 g. translated to 0.2 litres 27/08/09.  
Flotation-routine standard. Original entry of 10 lt. replaced by volume for sample from Flot Log 19/08/09. Flot Log Vo 
Architecture-subsample  Composition - Sub-sampled from archive for analyses. BT VIII/06 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell