When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 1228 | Page 1 of 1 (Total Records: 1)
| Sample No. | Type | Amount | Comment | Unit: 1228 | 260 | Flotation-routine | 16 | remainder of 1221 floor and under-floor packing Sample Amount was 18L updated to purely numeric val |
|
|
<< Back | Download these Samples |