When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 12322 | Page 1 of 1 (Total Records: 3)
| Sample No. | Type | Amount | Comment | Unit: 12322 | 1 | Architecture-mortar | 0.105 | particle size. Sample amount altered from 105 g to 0.105 litres 29/08/09 | 2 | Architecture-mortar | 0.078 | particle size, amount 78g translated to 0.078 litres 19/05/2010 | 3 | Architecture-subsample | | particle size: subsample from S1. Sample amount entered as 46.42 g removed from amount field as is a |
|
|
<< Back | Download these Samples |