When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 12603 | Page 1 of 1 (Total Records: 3)
| Sample No. | Type | Amount | Comment | Unit: 12603 | 1 | Architecture-mortar | 0.63 | particle size, amount 63g translated to 0.063 litres 19/05/2010 | 2 | Architecture-mortar | 0.113 | particle size. Sample amount altered from 113 g to 0.113 litres 29/08/09 | 3 | Architecture-subsample | | particle size: subsample from S2. Sample amount entered as 44.37 g removed from amount field as is a |
|
|
<< Back | Download these Samples |