Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 1367

Page 1 of 2 (Total Records: 19)
Sample No.TypeAmountComment
Unit: 1367 
Flotation-routine 15  Sample Amount was 15L updated to purely numeric value 28th July 2009. Original entry of 15 replace 
Flotation-routine  Sample Amount was 8-9L updated to purely numeric value 28th July 2009. Original entry of 8-9 repla 
Flotation-routine 0.01 Bulk. Amount was entered as bottle replaced by 0.01 litres as calc contents of a bottle 19/08/09 
Flotation-routine 0.75 Bulk Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 
Flotation-routine 0.75 Bulk (floor layer) Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 
Flotation-routine 0.01 Bulk. Amount was entered as bottle replaced by 0.01 litres as calc contents of a bottle 19/08/09 
Column Sample-micromorphological  SAJ - unable to translate sample amount into numeric figure (litres), not enough information, sample 
Flotation-routine 24  Sample Amount was 20L updated to purely numeric value 28th July 2009. Original entry of 20 replace 
Flotation-routine 20  Sample Amount was 20L updated to purely numeric value 28th July 2009. Original entry of 20 replace 
10 Flotation-routine 21  Sample Amount was 20L updated to purely numeric value 28th July 2009. Original entry of 20 replace 

Page: [1 2 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell