When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 1439 | Page 1 of 1 (Total Records: 6)
| Sample No. | Type | Amount | Comment | Unit: 1439 | 1 | Archive | 0.75 | plaster Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 | 2 | Plasters | | Sample Type changed from Plaster to Plasters 29/08/09. Amount originally entered as ? - therefore am | 3 | Archive | 0.75 | plaster Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 | 4 | Plasters | | Sample Type changed from Plaster to Plasters 29/08/09. Amount originally entered as ? - therefore am | 5 | Flotation-routine | 44 | Sample Amount was 24L updated to purely numeric value 28th July 2009. Original entry of 24 replace | 6 | Brick/ mortar/ packing | | SAJ - unable to translate sample amount into numeric figure (litres), not enough information, sample |
|
|
<< Back | Download these Samples |