Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 15190

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 15190 
Plasters-floor 20 plaster from whole surface of floor for flotation 
Other  no sample with this number taken 
Plasters-floor 0.3 thin section together with 15194, 15191 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell