When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 15191 | Page 1 of 1 (Total Records: 3)
| Sample No. | Type | Amount | Comment | Unit: 15191 | 1 | Flotation-average flotation | 20 | sample together with 15170 and 1590 from whole surface | 2 | Other | | no sample with this no. Taken | 3 | Plasters-floor | 0.5 | thin section of 15170, 15190, 15191 |
|
|
<< Back | Download these Samples |