Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 16620

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 16620 
Archive 0.5 routive 
Flotation-routine 18 routive. Original entry of 20 replaced by volume for sample from Flot Log 19/08/09. Flot Log Vol: 18 
Plasters-painted 0.5 specilist. Sample type changed from painted plaster sample to Plasters-painted 29/08/09 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell