Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 16842

Page 1 of 1 (Total Records: 8)
Sample No.TypeAmountComment
Unit: 16842 
Architecture-mortar 0.2 material analysis 
Architecture-mortar 0.2 material analysis 
Flotation-average flotation 33 routine 
Architecture  
Flotation-other  phytolits 
Architecture-mortar  200g from s1 for export 
Architecture-mortar  200g from s2 for export 
Architecture-mortar  half of s4 for export 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell