When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 16849 | Page 1 of 1 (Total Records: 6)
| Sample No. | Type | Amount | Comment | Unit: 16849 | 1 | Archive | 0.5 | routine | 2 | Archive | 0.5 | | 3 | Flotation-average flotation | 30 | taken as s1 2012, then another s1 was taken in 2013 | 4 | Architecture | | 200g from s2 for export | 5 | Architecture-mortar | | 200g from s1 for export | 6 | Architecture-mortar | | all of other s1 for export |
|
|
<< Back | Download these Samples |