Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 1833

Page 1 of 1 (Total Records: 2)
Sample No.TypeAmountComment
Unit: 1833 
Flotation-routine 20 brick 
Flotation-routine 10 mortar, Amount was originally entered as 10s, replaced by 10 litres 19/08/09 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell