Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 2008

Page 1 of 1 (Total Records: 7)
Sample No.TypeAmountComment
Unit: 2008 
Archive 0.75  Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 
Flotation-routine 28  Sample Amount was 30 L updated to purely numeric value 28th July 2009. Original entry of 30 replac 
Flotation-routine 0.1 small bones, Amount was originally entered as c 100g, replaced by 0.1 litres 19/08/09 
Flotation-routine 10 E end Sample Amount was 10 L updated to purely numeric value 28th July 2009. Original entry of 10 r 
Chemical Analysis-subsample  Sub-samlped from archive for chemical analysis. BT 3/8/05. Sample amount entered as 50 g removed fro 
Architecture-subsample  petrography - subsampled from S2, flot#783 
Architecture-subsample  petrography - subsampled from S4, flot#975 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell