Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 20568

Page 1 of 1 (Total Records: 4)
Sample No.TypeAmountComment
Unit: 20568 
Plasters-wall 0.4 Metu Study 
Plasters-painted 0.2 Painted plaster sequences study GB 08/07/2016 
Plasters-wall 0.05 plaster for consolidation study 
Plasters-wall 0.05 plaster for consolidation study 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell