When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 2102 | Page 1 of 1 (Total Records: 4)
| Sample No. | Type | Amount | Comment | Unit: 2102 | 1 | Plasters | | Sample Type changed from plaster to Plasters 29/08/09. SAJ - unable to translate sample amount into | 2 | Archive | 0.5 | Sample Amount was 1/2 envelope updated to 0.5 litre 28th July 2009 | 3 | Flotation-routine | 5 | Sample Amount was 5 L updated to purely numeric value 28th July 2009. Original entry of 5 replaced | 4 | block | | SAJ - unable to translate sample amount into numeric figure (litres), not enough information, sample |
|
|
<< Back | Download these Samples |