When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 2212 | Page 1 of 1 (Total Records: 7)
| Sample No. | Type | Amount | Comment | Unit: 2212 | 1 | Flotation-routine | 26 | from upper part of east half. Original entry of 30 litres replaced by volume for sample from Flot Lo | 2 | Archive | 0.5 | Sample amount originally entered as: normal replaced by 0.5 litres on 18/08/09 | 3 | Flotation-routine | 29 | from upper part of burial. Original entry of 30 litres replaced by volume for sample from Flot Log 1 | 4 | Flotation-routine | 28 | from W half of burial. Original entry of 30 litres replaced by volume for sample from Flot Log 19/08 | 6 | Flotation-routine | 28 | from E half of burial. Original entry of 30 litres replaced by volume for sample from Flot Log 19/08 | 7 | Chemical Analysis-subsample | | from sample 5, for compositional analysis by Birch and Guerre | 8 | | | x2 subsample 2012 mv |
|
|
<< Back | Download these Samples |