When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 2516 | Page 1 of 1 (Total Records: 5)
| Sample No. | Type | Amount | Comment | Unit: 2516 | 1 | Architecture | | Sample type changed from architectural to Architecture 29/08/09. SAJ - unable to translate sample am | 2 | Plasters-wall | | South. SAJ - unable to translate sample amount into numeric figure (litres), not enough information, | 3 | Plasters-wall | | North-. SAJ - unable to translate sample amount into numeric figure (litres), not enough information | 4 | Flotation-routine | 5 | clean, Amount was originally entered as 5, replaced by 5 litres 19/08/09 | 5 | Flotation-routine | 5 | mix with 2127, Amount was originally entered as c 5 replaced by 5 litres 19/08/09 |
|
|
<< Back | Download these Samples |