When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 2543 | Page 1 of 1 (Total Records: 5)
| Sample No. | Type | Amount | Comment | Unit: 2543 | 1 | Architecture | | architectural core. Sample type changed from architectural core to Architecture 29/08/09. SAJ - unab | 2 | Architecture | | architectural core. Sample type changed from architectural core to Architecture 29/08/09. SAJ - unab | 3 | Architecture | | architectural core. Sample type changed from architectural core to Architecture 29/08/09. SAJ - unab | 4 | Architecture | | architectural core. Sample type changed from architectural core to Architecture 29/08/09. SAJ - unab | 5 | Architecture | | architectural core from feature 3. Sample type changed from architectural core to Architecture 29/08 |
|
|
<< Back | Download these Samples |