Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 2571

Page 1 of 1 (Total Records: 5)
Sample No.TypeAmountComment
Unit: 2571 
Archive 0.5  Sample Amount was 1/2 envelope updated to 0.5 litre 28th July 2009 
Flotation-routine 26  Sample Amount was 30 L updated to purely numeric value 28th July 2009. Original entry of 30 replac 
Chemical Analysis-subsample  Sub-sampled from archive for chemical analysis. BT 5/8/05. Sample amount entered as 56 g removed fro 
Architecture-subsample  petrography - subsampled from S2, flto# 1252 
Architecture-subsample  Composition - subsampled from S1 SHL 07. Sample amount entered as c 50 g removed from amount field a 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell