When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 2575 | Page 1 of 1 (Total Records: 5)
| Sample No. | Type | Amount | Comment | Unit: 2575 | 1 | Archive | 0.5 | Sample amount originally entered as: 500 g replaced by numeric value 0.5 litres on 18/08/09 | 2 | Flotation-routine | 29 | Sample Amount was 30 L updated to purely numeric value 28th July 2009. Original entry of 30 replac | 3 | Chemical Analysis-subsample | | Sub-sampled from archive for chemical analysis. BT 5/8/05. Sample amount entered as 25 g removed fro | 4 | Architecture-subsample | | petrography - subsampled from S2, flot#1257 | 5 | Architecture-subsample | | Composition - subsampled from S1 SHL 07. Sample amount entered as c 50 g removed from amount field a |
|
|
<< Back | Download these Samples |