When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 3162 | Page 1 of 1 (Total Records: 3)
| Sample No. | Type | Amount | Comment | Unit: 3162 | 1 | Archive | 0.5 | see also 3365/53 micromorph. sample Sample Amount was 1/2 envelope updated to 0.5 litre 28th July 2 | 2 | Flotation-routine | 1 | Sample Amount was 1 l updated to purely numeric value 28th July 2009. Original entry of 1 replaced | 3 | Architecture-subsample | | Composition - Sub-sampled from archive for analyses. BT VIII/06. Sample amount entered as c. 40g rem |
|
|
<< Back | Download these Samples |