Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 32649

Page 1 of 1 (Total Records: 6)
Sample No.TypeAmountComment
Unit: 32649 
Archive 0.5 Base (100% deposit) 
Flotation-average flotation 15 Make up (100 % deposit) 
Archive 0.5 Make up 
Archive 0.5 Rim plaster 
Archive 0.5 Rim 
Flotation-average flotation 20 Rim (100% deposit) 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell