When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 3759 | Page 1 of 1 (Total Records: 9)
| Sample No. | Type | Amount | Comment | Unit: 3759 | 1 | Flotation-routine | 0.005 | Amount was originally entered as 5g, replaced by 0.005 litres 19/08/09 | 2 | Chemical Analysis-phosphate | 0.01 | Sample amount originally entered as 10 g translated to 0.01 litres 26/08/09 | 3 | Elemental analysis | 0.02 | | 4 | Elemental analysis | 0.02 | | 5 | Elemental analysis | 0.02 | | 6 | Archive | 0.01 | Sample amount originally entered as: 2 trowel replaced by numeric value 0.01 litres on 18/08/09 | 7 | Organic Residue-other | | interesting org.orange material + phytolith. SAJ - unable to translate sample amount into numeric fi | 8 | Flotation-routine | 15 | Original entry of 15 replaced by volume for sample from Flot Log (15) 19/08/09 | 9 | Chemical Analysis-subsample | | Sub-sampled from archive for chemical analysis. BT 5/8/05. Sample amount entered as 20 g removed fro |
|
|
<< Back | Download these Samples |