When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 3831 | Page 1 of 1 (Total Records: 3)
| Sample No. | Type | Amount | Comment | Unit: 3831 | 1 | Archive | 0.5 | Sample amount originally entered as: 500 g replaced by numeric value 0.5 litres on 18/08/09 | 2 | Flotation-routine | 4 | Sample Amount was 2L updated to purely numeric value 28th July 2009. Original entry of 2 replaced | 3 | Chemical Analysis-subsample | | Sub-sampled from archive for chemical analysis. BT 04. Sample amount entered as c. 50 g removed from |
|
|
<< Back | Download these Samples |