When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 3858 | Page 1 of 5 (Total Records: 46)
| Sample No. | Type | Amount | Comment | Unit: 3858 | 1 | Flotation-routine | 0.35 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr | 2 | Flotation-routine | 0.9 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr | 3 | Flotation-routine | 0.7 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr | 4 | Flotation-routine | 0.8 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr | 5 | Flotation-routine | 0.3 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr | 6 | Flotation-routine | 0.6 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr | 7 | Flotation-routine | 0.75 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr | 8 | Flotation-routine | 0.75 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr | 9 | Flotation-routine | 0.8 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr | 10 | Flotation-routine | 0.7 | Flotation on floor and subsequent sub-sampling. Original entry of ? replaced by volume for sample fr |
|
|
<< Back | Download these Samples |