Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 4255

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 4255 
Archive 0.5 Sample amount originally entered as: 500g replaced by numeric value 0.5 litres on 18/08/09 
Flotation-routine 16 routine Sample Amount was 20 L updated to purely numeric value 28th July 2009. Original entry of 20 
Architecture-subsample  Composition - Sub-sampled from archive for analysis. BT VII/06. Sample amount entered as 46 g remove 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell