When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 4726 | Page 1 of 1 (Total Records: 3)
| Sample No. | Type | Amount | Comment | Unit: 4726 | 1 | Archive | 0.015 | Sample amount originally entered as: A few trowels full replaced by 0.015 litres on 18/08/09 | 2 | Flotation-routine | 0.375 | Sample Amount was <1 L updated to purely numeric value 28th July 2009. Original entry of 1 replace | 3 | Chemical Analysis | 0.004 | from archive sample. Sample amount altered from 4g to 0.004 litres 29/08/09 |
|
|
<< Back | Download these Samples |