Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 5131

Page 1 of 1 (Total Records: 4)
Sample No.TypeAmountComment
Unit: 5131 
Archive 0.5 Routine 
Flotation-routine Routine Sample Amount was 2L updated to purely numeric value 28th July 2009. Original entry of 2 re 
Architecture-subsample  Composition - Sub-sampled from archive for analysis. BT VII/06. Sample amount entered as 95 g remove 
Botanics-phytoliths 0.02 subsample of s1 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell