Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 5400

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 5400 
Flotation-routine 30 No sample amount was entered by excavator and no flot record exists so amount taken as standard amou 
Other 20 no sample type entered originally but comment:S. Half. 
Flotation-routine 14 no sample type entered originally but comment:N. Half. Original entry of 18 replaced by volume for s 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell