When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6100 | Page 1 of 2 (Total Records: 15)
| Sample No. | Type | Amount | Comment | Unit: 6100 | 1 | Botanics-charcoal | 0.1 | Sample amount originally entered as 50g+50g, translated to 100gr = 0.10 litres 27/08/09. | 2 | Archive | 0.75 | Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 | 3 | Flotation-routine | 19 | Sample Amount was 12 l updated to purely numeric value 28th July 2009. Original entry of 12 replac | 4 | Botanics-charcoal | 0.005 | charcoal - 6 wood identific.. Sample amount originally entered as 5 grm translated to 0.005 litres 2 | 5 | building material | 0.3 | Amount 300gr translated to 0.005 litres 19/05/2010 | 6 | building material | | | 7 | building material | | | 8 | building material | | | 9 | building material | | | 10 | Flotation-routine | 4 | Sample Amount was 4 l updated to purely numeric value 28th July 2009. Original entry of 4 replaced |
|
|
<< Back | Download these Samples |