Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 6130

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 6130 
Flotation-routine 30  Sample Amount was 30L updated to purely numeric value 28th July 2009 
Archive 0.75  Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 
Plasters  Sample Type changed from plaster to Plasters 29/08/09 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell