When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6134 | Page 1 of 1 (Total Records: 7)
| Sample No. | Type | Amount | Comment | Unit: 6134 | 1 | Flotation-routine | 12 | standard Sample Amount was 12l updated to purely numeric value 28th July 2009. Original entry of 12 | 2 | Archive | 0.2 | Sample amount originally entered as: 200g replaced by numeric value 0.2 litres on 18/08/09 | 3 | Botanics-phytoliths | 0.005 | floor. Sample amount originally entered as 5g translated to 0.005 litres 26/08/09. | 4 | Chemical Analysis-phosphate | 0.005 | phosphate - floor. Sample amount originally entered as 5g translated to 0.005 litres 26/08/09 | 5 | Chemical Analysis-ICP | 0.005 | floor. Sample amount originally entered as 5g translated to 0.005 litres 26/08/09 | 6 | Botanics-phytoliths | 0.3 | on top of floor. Sample amount originally entered as 300g translated to 0.3 litres 27/08/09 | 7 | burnt material | 0.005 | area of burning on floor. Sample amount originally entered as 5g translated to 0.005 litres 26/08/09 |
|
|
<< Back | Download these Samples |