When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6140 | Page 1 of 1 (Total Records: 7)
| Sample No. | Type | Amount | Comment | Unit: 6140 | 1 | Flotation-routine | 20 | standard Sample Amount was 20l updated to purely numeric value 28th July 2009. Original entry of 20 | 2 | Botanics-phytoliths | 0.005 | standard. Sample amount originally entered as 5g translated to 0.005 litres 26/08/09. | 3 | Chemical Analysis-phosphate | 0.005 | standard. Sample amount originally entered as 5g translated to 0.005 litres 26/08/09 | 4 | Chemical Analysis-ICP | 0.005 | standard. Sample amount originally entered as 5g translated to 0.005 litres 26/08/09 | 5 | Building material | 0.02 | standard. Sample amount altered from 20g to 0.02 litres 29/08/09 | 6 | Archive | 0.2 | Sample amount originally entered as: 200g replaced by numeric value 0.2 litres on 18/08/09 | 7 | Flotation-routine | 4 | standard. Original entry of ???? replaced by volume for sample from Flot Log 19/08/09. Flot Log Vol: |
|
|
<< Back | Download these Samples |