When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6174 | Page 1 of 1 (Total Records: 7)
| Sample No. | Type | Amount | Comment | Unit: 6174 | 1 | Archive | 0.75 | standard Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 | 2 | Flotation-routine | 18 | standard Sample Amount was 13l updated to purely numeric value 28th July 2009. Original entry of 13 | 3 | Chemical Analysis-ICP | 0.05 | standard. Sample amount originally entered as 50g translated to 0.05 litres 27/08/09 | 4 | Botanics-phytoliths | 0.05 | standard. Sample amount originally entered as 50g translated to 0.05 litres 27/08/09. | 5 | Chemical Analysis-phosphate | 0.05 | standard. Sample amount originally entered as 50g translated to 0.05 litres 27/08/09 | 6 | Botanics-phytoliths | 0.005 | large visible pieces. Sample amount originally entered as 3 pieces translated to 0.005 litres 27/08/ | 7 | Building material | | floor layers visible. SAJ - unable to translate sample amount into numeric figure (litres), not enou |
|
|
<< Back | Download these Samples |