When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6189 | Page 1 of 1 (Total Records: 6)
| Sample No. | Type | Amount | Comment | Unit: 6189 | 1 | Archive | 0.005 | Sample amount originally entered as: 1 trow replaced by numeric value 0.005 litres 18/08/09 | 2 | Chemical Analysis-ICP | 0.02 | | 3 | Botanics-phytoliths | 0.02 | | 4 | Chemical Analysis-phosphate | 0.02 | | 5 | Flotation-routine | 21 | standard Sample Amount was 16 L updated to purely numeric value 28th July 2009. Original entry of 1 | 6 | building material | 0.05 | |
|
|
<< Back | Download these Samples |