Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 6194

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 6194 
Flotation-routine  Sample Amount was 1L updated to purely numeric value 28th July 2009 
Archive 0.005 Sample amount originally entered as: trowel replaced by numeric value 0.005 litres 18/08/09 
construction   

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell