When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6203 | Page 1 of 1 (Total Records: 6)
| Sample No. | Type | Amount | Comment | Unit: 6203 | 1 | Archive | 0.005 | Sample amount originally entered as: trowel replaced by numeric value 0.005 litres 18/08/09 | 2 | Flotation-routine | 18 | 15 + 3 Sample Amount was 18 L updated to purely numeric value 28th July 2009. Original entry of 18 | 3 | Chemical Analysis-ICP | 0.005 | Sample amount originally entered as 1bg translated to 0.005 litres 24/05/2010 | 4 | Botanics-phytoliths | 0.005 | Amount 1 bg translated to 0.005 litres 19/05/2010 | 5 | Chemical Analysis-phosphate | 0.005 | Sample amount originally entered as 1bg translated to 0.005 litres 24/05/2010 | 6 | construction | | SAJ - unable to translate sample amount into numeric figure (litres), not enough information, sample |
|
|
<< Back | Download these Samples |