Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 6205

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 6205 
Flotation-routine 12.5  Sample Amount was 15L updated to purely numeric value 28th July 2009. Original entry of 15 replace 
Archive 0.2 Sample amount originally entered as: 200g replaced by numeric value 0.2 litres on 18/08/09 
building material 0.02 platform make-up. Sample amount altered from 20g to 0.02 litres 29/08/09 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell