When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6230 | Page 1 of 1 (Total Records: 5)
| Sample No. | Type | Amount | Comment | Unit: 6230 | 1 | Archive | 0.005 | Sample amount originally entered as: 1 trowel replaced by numeric value 0.005 litres 18/08/09 | 2 | Chemical Analysis-ICP | 0.02 | floor level. Sample amount altered from 20g to 0.02 litres 29/08/09 | 3 | Chemical Analysis-phosphate | 0.02 | phosphat - floor level. Sample amount altered from 20g to 0.02 litres 29/08/09 | 4 | Botanics-phytoliths | 0.02 | floor level. Sample amount originally entered as 20g translated to 0.02 litres 27/08/09. | 5 | Flotation-routine | 2 | standard Sample Amount was 3L updated to purely numeric value 28th July 2009. Original entry of 3 r |
|
|
<< Back | Download these Samples |