When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6242 | Page 1 of 1 (Total Records: 6)
| Sample No. | Type | Amount | Comment | Unit: 6242 | 1 | Archive | 0.05 | standard, Sample amount originally entered as: ~50g replace by 0.05 18/08/09 | 2 | Flotation-routine | 0.9 | standard Sample Amount was ~ 1L updated to purely numeric value 28th July 2009. Original entry of | 3 | Chemical Analysis-ICP | 0.03 | standard. Sample amount originally entered as ~30 g translated to 0.03 litres 26/08/09 | 4 | Chemical Analysis-phosphate | 0.03 | phosphate - standard. Sample amount originally entered as ~30 g translated to 0.03 litres 26/08/09 | 5 | Botanics-phytoliths | 0.03 | standard. Sample amount originally entered as ~30 g translated to 0.03 litres 26/08/09. | 6 | building material | 0.03 | standard. Sample amount originally entered as ~30 g translated to 0.03 litres 26/08/09 |
|
|
<< Back | Download these Samples |