When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6293 | Page 1 of 1 (Total Records: 6)
| Sample No. | Type | Amount | Comment | Unit: 6293 | 1 | Archive | 0.5 | standard Sample Amount was blank, updated to half a litre (0.5) 28th July 2009 | 2 | Flotation-routine | 5 | standard Sample Amount was 6L updated to purely numeric value 28th July 2009. Original entry of 6 r | 3 | Chemical Analysis-ICP | | standard | 4 | Botanics-phytoliths | | standard | 5 | Chemical Analysis-phosphate | | standard | 6 | Architecture | | standard |
|
|
<< Back | Download these Samples |