When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6365 | Page 1 of 1 (Total Records: 3)
| Sample No. | Type | Amount | Comment | Unit: 6365 | 1 | Flotation-routine | 30 | 1/3 of the bucket. No sample amount was entered by excavator and no flot record exists so amount tak | 2 | Archive | 0.5 | Sample Amount was blank, updated to half a litre (0.5) 28th July 2009 | 3 | architecture | | |
|
|
<< Back | Download these Samples |