Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 6365

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 6365 
Flotation-routine 30 1/3 of the bucket. No sample amount was entered by excavator and no flot record exists so amount tak 
Archive 0.5  Sample Amount was blank, updated to half a litre (0.5) 28th July 2009 
architecture   

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell