When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6385 | Page 1 of 1 (Total Records: 7)
| Sample No. | Type | Amount | Comment | Unit: 6385 | 1 | Flotation-routine | 30 | standard. No sample amount was entered by excavator and no flot record exists so amount taken as sta | 2 | Archive | 0.5 | standard Sample Amount was blank, updated to half a litre (0.5) 28th July 2009 | 3 | Botanics-phytoliths | | standard | 4 | Chemical Analysis-phosphate | | standard | 5 | Chemical Analysis-ICP | | standard | 6 | Architecture | | standard. Sample type changed from architectural to Architecture 29/08/09 | 7 | Flotation-routine | 18.7 | Sample Amount was blank, this has been imported from Bots 28th July 2009 Sample Amount was blank, t |
|
|
<< Back | Download these Samples |