When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 8185 | Page 1 of 1 (Total Records: 6)
| Sample No. | Type | Amount | Comment | Unit: 8185 | 1 | Archive | 0.5 | Sample amount originally entered as: 500g replaced by numeric value 0.5 litres on 18/08/09 | 2 | Flotation-routine | 8 | standard Sample Amount was 13L updated to purely numeric value 28th July 2009. Original entry of 13 | 3 | Botanics-phytoliths | 0.02 | standard. Sample amount originally entered as 20g translated to 0.02 litres 27/08/09. | 4 | Chemical Analysis-phosphate | 0.02 | standard. Sample amount altered from 20g to 0.02 litres 29/08/09 | 5 | Chemical Analysis-ICP | 0.02 | standard. Sample amount altered from 20g to 0.02 litres 29/08/09 | 6 | architecture | 0.08 | standard, amount 80g translated to 0.08 litres 19/05/2010 |
|
|
<< Back | Download these Samples |