When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 8261 | Page 1 of 1 (Total Records: 7)
| Sample No. | Type | Amount | Comment | Unit: 8261 | 1 | Archive | 0.2 | Sample amount originally entered as: 200g replaced by numeric value 0.2 litres on 18/08/09 | 2 | Flotation-routine | 3 | standard Sample Amount was 7L updated to purely numeric value 28th July 2009. Original entry of 7 r | 3 | Chemical Analysis-ICP | 0.2 | standard. Sample amount altered from 200g to 0.2 litres 29/08/09 | 4 | Chemical Analysis-phosphate | 0.2 | standard. Sample amount altered from 200g to 0.2 litres 29/08/09 | 5 | Botanics-phytoliths | 0.2 | standard. Sample amount originally entered as 200g translated to 0.2 litres 27/08/09. | 6 | Architecture | 0.35 | standard, amount 350g translated to 0.35 litres 19/05/2010 | 7 | Flotation-routine | 1 | platform lip Sample Amount was 1L updated to purely numeric value 28th July 2009. Original entry of |
|
|
<< Back | Download these Samples |