When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 8617 | Page 1 of 1 (Total Records: 3)
| Sample No. | Type | Amount | Comment | Unit: 8617 | 1 | Flotation-routine | 13 | standard Sample Amount was 13 l updated to purely numeric value 28th July 2009. Original entry of 1 | 2 | Archive | 0.75 | standard Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 | 3 | Architecture-subsample | | Composition - subsampled from S2 SHL 07. Sample amount entered as c. 50g removed from amount field a |
|
|
<< Back | Download these Samples |